New sites this week

Some of the sites we have connected up over the last week – including one in the heart of busy Wembley, requiring reconfiguration of the LV DNO network, extensive traffic management and quite a bit of trenching in the footway – all business as usual for us!!

By running load flow analysis of the local LV network and re-configuring it, we were able to move the point of connection from over 100m away from the site (which required a road crossing across a major traffic junction), to within 50m, This completely changed the economics of the job – making it viable for the client, another step in delivering the Electric Vehicle Revolution.