In this episode, Brian & Damian go through step-by-step how NESO plans for this to work, alongside raising some discussion points and issues.
After the Connection Queue is filtered by Gate 2 (see previous episode), the Connections Network Design Methodology (CNDM) sets how the Connection Queue will be re-ordered and sorted to allocate capacity and substation connection points.
In this episode, Brian & Damian run through step-by-step how NESO plans for this to work, alongside raising some discussion points and issues that you may want to raise in your consultation response. If you want to get your head around the CNDM consultation in 20 minutes, this episode is a great way to start.
Links to useful reference materials:
Reform Consultation Timeline: https://esmartnetworks.co.uk/wp-content/uploads/2024/11/Ongoing-Upcoming-Industry-Consultations-esmart-Networks.png
6-page summary doc from ESO: https://www.nationalgrideso.com/document/316446/download
NGESO Connection Reform web page: https://www.nationalgrideso.com/industry-information/connections/connections-reform
Capacity Crunch: State of Play in May podcast (covering why this is needed): https://youtu.be/cH0r8iC3h7Q
Listen to the podcast here:
Spotify: https://ow.ly/3mFo50Ubyf4
Apple Podcast: https://ow.ly/wQIM50UbyeK
YouTube: https://ow.ly/wGM350UbyeN
Web Player: https://ow.ly/yGUv50UbyeP
YouTube: https://youtu.be/M8RFUosjs_s
Follow us on our social media channels:
LinkedIn: https://www.linkedin.com/company/esmart-networks/
Instagram: https://www.instagram.com/esmartnetworks
Twitter: https://twitter.com/esmartnetworks1
Facebook: https://www.facebook.com/eSmartNetworks
Brian Moorhead MEng MIET Assoc CIPD is Grid Services Director at eSmart Networks, heading up our UK-wide Grid Consultancy Team.
Brian has spent his whole career in the power industry across a range of roles focused on industrial electrification to the grid, connecting renewables, battery storage and EV charging.
His previous roles include Programme Management of Major Connections (11kV to 275kV) focused on Large Energy Users, Renewable and large-scale Battery Storage Projects; management of the DNO-ICP interface, developing grid policy at a nationwide level and client-facing project design & management.